The giant Mitsubishi HD LED video screen weighs over 600 tons and is 160' X 70'.
The cost of the stadium construction was $1.15 billion.
The stadium seats 80k to 100k people by utilizing a moveable seating system.
Coon Engineering survey department was responsible for ensuring the placement of the steel beams used to construct the stadium. It was absolutely necessary that everything be accurate and precise so that the retractable roof would operate correctly. We also assisted in the placement of the 600 ton HD screen. It is the largest in the world to date.